日韩人妻无码免费视频一区二区三区,久久99精品国产麻豆不卡,性男女做视频观看网站,国产台湾无码av片在线观看

AC source power & DC source power manufacturing factory

Calculating method of alarm current

As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
the following are introduced separately:

One:Single-phase power supply
Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

Two: Three-phase power supply
The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
Recommend Products
Online service
Service Hotline
86-769-89616802
86-13602353727

ADMIRE POWER
成人av无码一区二区三区| 18禁成人黄网站免费观看久久| 精品久久久中文字幕人妻| 国产精品人成视频免费vod| 日本xxxx色视频在线观看免费| 999久久久免费精品国产| 国产中文字幕乱人伦在线观看| 人妻无码视频一区二区三区| 97精品国产一区二区三区| 综合久久给合久久狠狠狠97色| 69精品人人人人| 久久精品国产亚洲av嫖农村妇女| 国产熟女亚洲精品麻豆| 无码一区二区三区免费| 在线成人国产天堂精品av| 白又丰满大屁股bbbbb| 久久99er精品国产首页| 日韩精品一区二区三区中文不卡| 人妻无码中文字幕永久在线| 性色av免费观看| 毛片a久久99亚洲欧美毛片| 一二三四在线视频社区3| 欧美黑人又粗又大xxxx| 黑人大战欲求不满人妻| 国产色视频网免费| 亚洲精品午夜无码电影网| 日本精品一区二区三区在线视频| 男女18禁啪啪无遮挡激烈网站| 麻豆果冻传媒精品国产av| 亚洲最大天堂无码精品区| 中文字幕精品久久久久人妻红杏1| 少妇的肉体k8经典| 国产熟人av一二三区| 国产国拍亚洲精品永久软件| 麻豆tv入口在线看| 韩国主播av福利一区二区| 欧美性xxxxx极品娇小| 人妻丰满被色诱中文字幕| 特级毛片爽www免费版| 九月婷婷人人澡人人添人人爽| 国产精品99久久免费观看|